Cost to Complete is a forensic analysis of the current, in-progress job status of an ongoing construction project, combined with a detailed evaluation of the remaining work and budget to complete it, estimated by a Quantity Surveyor, and contained in a QS Report. The QS Report requires an inspection to verify current status and existing conditions on the building site. The Cost to Complete estimates the time and funds required to complete the construction project.